All Olympics Articles

The engineering challenges of Grand Paris Express, Europe’s largest transport infrastructure project
Société du Grand Paris boss, Bernard Cathelain, tells KHL’s Lucy Barnard about the engineering challenges behind Europe’s largest transport infrastructure project
New generation XCMGs on site
Recently-launched XCMG boom lifts are involved in a range of major construction projects 
ALE roof installation
Olympic swimming venue roof installed by ALE in Argentina
GGR in the Olympic Park
A GGR mini crane has been helping install panes of glass on the Queen Elizabeth Olympic Park Aquatics Centre in London, UK
Building for the future
Latin America’s good growth rate is encouraging crane manufacturers and service providers to invest in the region. IC finds out more
Comansa towers from Roll-Lift at Maracaná stadium
Tower cranes from Roll-Lift are helping in the refurbishment of the Jornalista Mário Filho (Maracaná) stadium in Brazil to host the 2014 football world cup
Olympic weight lifting for Weldex
Scottish crawler crane company Weldex was called on to supply a long reach Liebherr LR 11350 crawler crane to assist in the construction of a cable car service over the River Thames
Access in Orbit at Olympics
With the majority of the construction work complete at the London 2012 Olympic site, the landscapers are moving in, but there are still a few jobs to be completed with the assistance of access equipment, including the construction of the futuristic steel sculpture, The ArcelorMittal Orbit
Lion Trackhire supplies road for London Olympics site
Portable roadway rental company Lion Trackhire provided a temporary track for a 1200 t crawler crane working at London’s 2012 Olympic Village site earlier this year.
VIDEO: New bridge for London 2012 rowing and canoe venue
A new bridge has been lifted into place at the Eton College Rowing Centre at Dorney Lake near Windsor ahead of the London 2012 Olympic Games.
VIDEO - London 2012's Olympic Stadium raises the roof
London's 2012 Olympic Stadium has reached another construction milestone as the cable net roof is lifted into place, ensuring the Stadium remains on target for completion by mid-2011.