London 2012: New Olympic rail bridge lifted into place

30 January 2009

The new entrance to Stratford International Station, known as the Eastern Egress, has been successfully lifted into place ready for the official opening in December for high speed domestic services. The 36 m-long bridge was lifted, fully glazed, 13 m above the domestic service railway lines at the station by a 1000 tonne crane. The bridge was jointly funded by the London 2012 Olympic Delivery Authority (ODA), the UK’s Department for Transport, and High Speed 1, operators of the Channel Tunnel Rail Link (CTRL). It will form part of the interchange between Stratford International, Stratford City and Stratford Regional Station, enabling more direct pedestrian access between the three. The bridge brings Stratford International and Regional stations 200 m closer together, allowing spectators to walk more easily between the two stations when visiting the Olympic Park during the 2012 Games.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, World Crane Week Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Long Reads
Top 5 private equity rental acquisitions 2021
We pick out five prominent acquisitions that have occurred throughout the year
Top 10 tower crane companies 2021
Who are the new entrants and which firms head up International Cranes and Specialized Transport magazine’s annual list of the world’s largest tower crane-owning companies?
Detailing North America’s latest breakbulk projects
Wind components, vessels and modules, ACT rounds up several significant breakbulk cargo projects.
CONNECT WITH THE TEAM
Alex Dahm Editor, International Cranes and Specialized Transport Tel: +44(0) 1892 786 206 E-mail: alex.dahm@khl.com
Mike Posener Sales Manager Tel: +353 860 431 219 E-mail: mike.posener@khl.com
CONNECT WITH SOCIAL MEDIA