All Power generation Articles

83 metre blades moved by P Adams
Transport specialist moved 83 metre rotor blades using its new Scheuerle RBTS
Sarens performs critical installation at nuclear site
The Tennessee Valley Authority (TVA) initiated a major nuclear refueling and maintenance outage so that four replacement steam generators could be installed at the Watts Bar nuclear plant.
Palfinger crawler crane chosen for power plant lift
Crane on site for lift at pumped storage power plant in Bergheim, Austria
Wheeled mobile telescopic crane installs 8.5 MW wind turbine
First job for China’s 2,600 tonne capacity world record all terrain crane built by XCMG
Mammoet adds Tadano crawler for Brazil
Mammoet expands its wind energy service fleet in Brazil with new 650 tonne capacity crawler crane
Scale of Ukraine reconstruction highlighted at Bauma
Cost of reconstruction could be as high as US$540 billion
XCMG 2,600 tonne AT crane tested
Chinese manufacturer puts largest all terrain crane to the test with 173 tonne load
Jib option for Mammoet SK6,000
New 3,000 tonne capacity (at 220 metres) fixed jib option extends capability of 6,000 tonne super heavy lift crane
Complex steam converter removal by Mammoet
Some large components required careful manipulation inside a nuclear power plant in Germany
Video: Power station intake head lowered into Bristol Channel
Balfour Beatty uses two heavy lift vessels to place nuclear plant’s final head 25m below surface
Korean and Kuwaiti companies move together
Gulf Maritime General Trading Contracting and Hansaeng Express collaborated on a project to move and install a large transformer
How is technology being used in wind energy construction?
Latest projects are utilising technology to develop new methods of construction
Huisman announces 700 tonne onshore crane
New 700 tonne capacity travelling quay crane for the wind energy industry
€23.5bn UK nuclear project gets go-ahead
UK government and EDF now in discussions over funding of Sizewell C project
Production starts on 3,000 tonne crane for BMS
Huisman starts work on 3,000 tonne capacity super heavy lift ring crane for BMS Heavy Cranes
New clamps allow transportation of larger tower sections and fewer modifications to roads
Investment of new equipment brings opportunity to the wind farm for larger turbine sections
Sarens and PSG join for wind work
Sarens and PSG Marine & Logistics form joint-venture operation for offshore wind work in Scotland
Sany delivers 3,000 tonne crawler crane
Double lattice boom model to make its first lift on the Hualong One nuclear power project in China
Orion heavy lifter ready to work
Offshore wind installation vessel with 5,000 tonne capacity crane ready to go to work
Mammoet to start building 6,000 tonne crane
Production of SK6,000 super heavy lift ring crane scheduled to begin in third quarter of 2022
Page 1 of 16