Tricky transport job for Krebs with Faymonville

Krebs Korrosionsschutz transported five 325 tonne MAN diesel engines out of a warehouse to the edge of the pier at Cuxport deep water terminal in Germany.

engine on trailer in german port Each engine weighed 325 tonnes (Photo: Faymonville)

The Krebs teams assembled a self-propelled heavy duty platform trailer for this task in the form of a 12-axle variant with a 372 kW power pack.

Challenging spaces

The smaller size of the warehouse doorway was a challenge.

The loading height in the driving position of the combined module and load was over 8.07 metres and the clearance height of the door was 8.1 metres, a miniscule gap to fit.

engine on faymonville trailer in warehouse The cargo stored inside the warehouse (Photo: Faymonville)

“We had precise transport technology like the 3,000 mm-wide and 8-fold tyred ModulMax,” said Krebs supervisor Jörg Neuhäusel, explaining the demanding boundary conditions.

The electronic steering ensured millimetre precision and the 4.5 metre wide combination steered safely through after which a pontoon crane was waiting abeam to lift the engines into the freight ship.

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, World Crane Week Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
CONNECT WITH THE TEAM
Alex Dahm Editor, International Cranes and Specialized Transport Tel: +44(0) 1892 786 206 E-mail: alex.dahm@khl.com
Matt Burk VP Sales Tel: +1 773 610 9467 E-mail: matt.burk@khl.com
CONNECT WITH SOCIAL MEDIA