Ainscough bridge installation job

By Christian Shelton10 August 2020

The heavy cranes division of UK crane company Ainscough Crane Hire worked with UK bridge manufacturer CTS Bridges to help install a new 40 metre bridge over the River Goyt in Stockport. Ainscough was appointed to the project by CTS Bridges as part of its work for main contractor Bethell Construction.

To install the bridge Ainscough used its Liebherr LTM1750-9.1 800 tonne capacity mobile crane with 204 tonnes of counterweight and a 52-metre guyed main boom.

The bridge is part of a new off-road walking and cycling route, which is one element in Stockport Metropolitan Borough Council’s £73million Town Centre Access Plan.

Ainscough’s heavy cranes team on this project comprised: Dave Baxter, technical contracts manager; Mark Brown, lift supervisor; and crane operators Ashley Winter, Danny Carrick, Kevin McLafferty and Andy Jackson.

Liebherr LTM1750-9.1 used to install bridge

Ainscough Crane Hire used its Liebherr LTM1750-9.1 to install the bridge

 

MAGAZINE
NEWSLETTER
Delivered directly to your inbox, World Crane Week Newsletter features the pick of the breaking news stories, product launches, show reports and more from KHL's world-class editorial team.
Long Reads
Your guide to the SC&RA Crane & Rigging Workshop
The 2022 Crane & Rigging Workshop will reunite SC&RA members in Dallas, TX.
Steffan Industries provides rigging and lifting for lunar logistics
The company has been playing a key role in the transport of lunar robotics for PA-based Astrobotic.
Looking back at the iconic Bauma trade show
After a delay and other challenges associated with the Covid-19 pandemic, Bauma 2022 will happen this month in Munich!
CONNECT WITH THE TEAM
Alex Dahm Editor, International Cranes and Specialized Transport Tel: +44(0) 1892 786 206 E-mail: alex.dahm@khl.com
Mike Posener Sales Manager Tel: +353 860 431 219 E-mail: mike.posener@khl.com
CONNECT WITH SOCIAL MEDIA